1990
Industrial Lagoon / Pond Treatment
Capital Cost = $1,800,000.
Daily Rental Rate = not available
Flow Rate = 125 gpm treating 24/7
(click for flow process diagram)
Total Lead Time = 1.5 years
Bid Package Design = 9 months
Equipment Design = 2 months
Fabrication = 4 months
Installation = 3 months
Equipment Design = 2 months
Fabrication = 4 months
Installation = 3 months
UniPure's Responsibilities:
- System Design
- Equipment Design
- Fabrication
- System Start-Up
- Operator Training
Metals Removal:
Influent Conc. (mg/l)
7.15
0.16
0.055
0.08
0.16
0.40
7.15
0.16
0.055
0.08
0.16
0.40
Arsenic
Cadmium
Chromium
Copper
Nickel
Lead
Effluent Conc. (mg/l)
<.10
0.06
<0.015
<0.009
0.06
<0.10
<.10
0.06
<0.015
<0.009
0.06
<0.10
Note: Unocal/Unipure guaranteed effluent quality and compliance with site's discharge requirements.
2000
(click for before & after pictures)
Active Acid Mine Drainage Treatment
Capital Cost = $750,000.
Optional Daily Rental Rate = $4,200.
Flow Rate = 190 gpm treating 24/7
(click for flow process diagram)
Total Lead Time = 10 months
Bid Package Design = 5 months
Equipment Design = 1 month
Fabrication = 3 months
Installation = 1 month
Equipment Design = 1 month
Fabrication = 3 months
Installation = 1 month
UniPure's Responsibilities:
- System Design
- Equipment Design
- Fabrication
- Mobilization
- Installation Oversight
- Operation & Maintenance
Metals Removal:
Influent Conc. (mg/l)
1800
20.0
0.61
3.8
3.0
13.0
1200
130
15.0
10.0
1800
20.0
0.61
3.8
3.0
13.0
1200
130
15.0
10.0
Aluminum
Arsenic
Cadmium
Chromium
Cobalt
Copper
Iron
Manganese
Nickel
Zinc
Effluent Conc. (mg/l)
.46
<0.02
<0.004
<0.05
&ly;0.10
<0.01
<0.50
1.6
0.05
<0.10
.46
<0.02
<0.004
<0.05
&ly;0.10
<0.01
<0.50
1.6
0.05
<0.10
Note: Unipure guaranteed effluent quality and compliance with site's discharge requirements.
2012
(click for before & after pictures)
Ash & Coal Run-Off Treatment
Capital Cost = $0.
Daily Rental Rate < $700.
Flow Rate = 250 gpm treating 24/7
(click for flow process diagram)
Total Lead Time = 2 weeks
Equipment Sourcing = 5 days
Installation = 3 days
Demobilization = 3 days
Installation = 3 days
Demobilization = 3 days
UniPure's Responsibilities:
- System Configuration
- Equipment Sourcing
- Mobilization
- Installation
- O&M
- Demobilization
Metals Removal:
Influent Conc. (mg/l)
112
0.73
0.012
0.14
0.57
0.08
3.04
112
0.73
0.012
0.14
0.57
0.08
3.04
Aluminum
Arsenic
Cadmium
Chromium
Copper
Lead
Zinc
Effluent Conc. (mg/l)
.50
<0.003
<0.003
<0.01
<0.01
<0.03
0.09
<0.003
<0.003
<0.01
<0.01
<0.03
0.09
Note: UniPure guaranteed effluent quality and compliance with site's discharge requirements.